Perfect outcomes for GE Healthcare
Perfect outcomes for GE Healthcare
CHALLENGE:
To bring a manufacturing facility and QC Lab back into production ASAP after major flood damage.
PERFECT OUTCOME:
In 3 months it was back in full production.

What our clients say
Scitech have the specialist knowledge and capabilities to ensure a compliant solution was delivered. Engaging with Scitech early in a project can ensure the correct approach is made and offer significant time and financial benefits to the overall result.
Scitech’s designers fully understood the nature and requirements of our business and engaged with the users to develop a modular design for the cell culture laboratories and GMP suites. The project was delivered successfully and ongoing support was provided to ensure the commissioning and functional operation of the laboratories.
The facility enables us to reconfigure the laboratories with minimal time and effort, in order to meet the changing needs of our work.
I’ve used Scitech to act as consultants and provide commissioning services on two major radiopharmaceutical production facilities in Belfast and Cardiff. Scitech were a key partner in designing, commissioning and validating the facility and played a major part in successfully delivering a functioning facility.
We needed a company to partner with us at all stages, from initial feasibility, through detailed facility design on the build programme and to the final commissioning. We have been impressed by the technical calibre of the Scitech team and their overall professional approach to keeping our project on time, specification and budget. We look forward to our facility opening in 2012 following a true partnership with the full Scitech team.
See how we have worked in practise click to view our case studies
Contact us
SUBJECT
MESSAGE
We take your privacy seriously and will only use your information as described in our Privacy Notice. By sending this form you consent to the uses of data as outlined in the Privacy Notice