image

Perfect Outcomes : Teva

Teva

Challenge: Design and construct new packaging capacity within existing site, adjoining existing buildings.

Perfect outcome: Scitech planning and modeling enabled design and construction of three storey building with four packing halls, on three floors, new loading bay and optimal use of space, people and material flows between buildings.